Belt Splicing – ZEP Underground

Installation and splicing of the belt at the main ramps of the conveyor system. This project was developed in 3 ramps, each one about 2km long, representing 8 belt splicing.

Activities Developed:

-Completion of roller installation and fine-tuning of the structure;

-Pulling belt through suspended tables, turning stations including belt splicing;

-Assembly of the motor gear drive;

-Construction of concrete slab for the installation of pulling winch;

-Special tools fabrication to support assembly works;

-Fine-tune of the Gravity Take-Up Cart.

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.