Belt Splicing – ZEP Underground

Installation and splicing of the belt at the main ramps of the conveyor system. This project was developed in 3 ramps, each one about 2km long, representing 8 belt splicing.

Activities Developed:

-Completion of roller installation and fine-tuning of the structure;

-Pulling belt through suspended tables, turning stations including belt splicing;

-Assembly of the motor gear drive;

-Construction of concrete slab for the installation of pulling winch;

-Special tools fabrication to support assembly works;

-Fine-tune of the Gravity Take-Up Cart.