Ethanol on Gasoline 95, a piping and equipment project, at CLC’s fuel storage facility, in Aveiras.
Developed activities:
-Pre-fabrication and assembly of piping;
-Pre-fabrication and assembly of piping supports;
-Supply and assembly of equipment;
-Fabrication and assembly of metal structure and shed;
-Installation and alignment of industrial pumps;
-Pre-commissioning.