Preassembled pipe-rack comprising piping, cable trays, cables and instruments, within a steel frame. All inspections, testing, painting and insulation were completed prior to shipping. Installation of Modules have been performed, at Site, by our dedicated Team.
Developed Activities:
-Project Management;
-Structural Steel and Piping material supply;
-E&I material supply;
-Insulation material supply;
-Welding Ndt’s and pressure test;
-Multidisciplinary Assembly works;
-Site installation;
-Management and control of subcontractors.