EPC project of a new By-pass in the pre-heater, in which the works took place with the plant in operation.
Activities developed:
-Fabrication of bag filter, silo, ducts and structure;
-Assembly of equipment, instruments, fans and conveyors;
-Execution of Tie-ins during shutdown.