Mecwide

Installation of New By-pass at pre-heater

EPC project of a new By-pass in the pre-heater, in which the works took place with the plant in operation.

Activities developed:

-Fabrication of bag filter, silo, ducts and structure;

-Assembly of equipment, instruments, fans and conveyors;

-Execution of Tie-ins during shutdown.