Revamping of the pickling and passivation unit at Steel Mill.
Developed activities:
-Dismantling of the existing unit (piping and equipment);
-Pre-fabrication of CS, SS and PP piping;
-Installation of CS, SS and PP piping;
-Assembly of equipment (tanks, pumps, exchangers, etc.);
-Manufacture and assembly of modules in Portugal;
-Installation and interconnection of modules at the client’s facilities;
-Execution of thermal insulation.