Installation of piping and equipment in a bioethanol production unit for Carbon Capture and Storage (CCS).
Developed activities:
-Prefabrication of CS and SS piping;
-Installation of CS and SS piping;
-Assembly of equipment (tanks, pumps, exchangers, etc.);
-Execution of thermal insulation and electrical tracing.