Developed activities:
-Pre-fabrication and Assembly of Piping;
-Supply and Assembly of Piping supports;
-Installation and Alignment of Pumps;
-Fire Fighting Network Installation;
-Pre-Commissioning and Hydrostatic Tests;
-Manufacture and Erection of Metallic Structures.